Waste Management
We’re deploying best-in-class technologies to design, build, and operate facilities that handle waste with precision. By applying the finest techniques available, we ensure responsible solid waste disposal. Rigorous checks guarantee the waterproof integrity of waste cells, preventing any environmental impact. We pioneer curtail the process's ecological footprint and provided many services: • Solid waste management • Engineering Landfill Cell’s • Material Recovery Facility (MRF) • Leachate Treatment Plants (LTP) • C&D Waste Recycling Facility • Gas Collection Plant
1.1 The Environmental Complex in Hail City
Design and built of an Full Engineered Landfill for compliant waste management. Scope includes a complete infrastructure works, roads, buildings, Cell's, Hazard waste, leachate collection system and a dedicated Construction & Demolition (C&D) Waste Station to ensure efficient and sustainable waste handling.










1.2 Material Recovery Facility (MRF)
The project includes the design and construction of the MRF plant, including all equipments for waste sorting line into different categories, and sustainable waste management.




1.3 O&M of C&D Waste Recycling Facility (BOT Project)
This eco-centric project streamlines waste management by processing 2,500 tons of Construction & Demolition Waste (CDW) daily, employing advanced tracking technology to register and manage waste producers. Round-the-clock management of site facilities ensures uninterrupted service and optimal operation.






1.4 NWC Taif Landfill Project
A waste disposal cell was constructed with NWC in Taif with 40,000.00m². The scope included excavation and installation of a multi-layer lining system consisting of an HDPE liner, geotextile, GCL layer and gravel. Designed and constructed as per MWAN requirements.







1.5 Construction of 9 Transfer Stations in Hail Villages
Construction of 9 waste transfer stations in Hail. Works included collection platforms, loading areas, steel structures, storage, infrastructure & civil works, weighbridges, and provision of machinery for operations.





1.6 Hajal Project of Hazardous Waste Cells
Design and construction of 5 hazardous waste cells and landfill facilities. Works included excavation and multi-layer lining. Each cell engineered to prevent leachate leakage and ensure long-term environmental protection.





1.7 Aramco Evaporation Ponds in a Biological Farm
Construction of evaporation ponds at a biological farm. Works included lining with multi-layer protective systems and installation of necessary infrastructure to safely manage and evaporate wastewater.





1.8 Operation (O&M) of Tabuk MSW Landfill
Operation and management of the Tabuk Municipal Solid Waste (MSW) 1000 TPD, including daily waste handling, sorting waste, equipment maintenance, and productivity monitoring.






